INFRASTRUCTURE DATA DESK

India Data Centre Capacity Map

Explore disclosed cloud and data-centre projects in India, their reported stage, capacity and original sources. Approximate city locations, not facility addresses.

Snapshot checked: 8 Oct 2026 · Manual editorial updates

Project directory and reported capacity

Interactive map controls load with JavaScript. All project data and original source links remain available below.

AWS Asia Pacific (Mumbai)

AWS · Mumbai, Maharashtra · Operational as reported

MW not disclosed · Region launched in 2016

Operational region as reported by AWS; 2026 commitment funds further expansion. Investment does not reveal regional MW.

AWS: AWS cloud infrastructure investment in India and operational regions · 18 May 2023 · Older disclosure — check the original source

AWS Asia Pacific (Hyderabad)

AWS · Hyderabad, Telangana · Operational as reported

MW not disclosed · Region launched November 2022

Operational region as reported by AWS. Availability zones and spending are not converted into a MW estimate.

AWS: AWS cloud infrastructure investment in India and operational regions · 18 May 2023 · Older disclosure — check the original source

Visakhapatnam AI hub

Google Cloud · Visakhapatnam, Andhra Pradesh · Announced as reported

Gigawatt-scale · qualitative disclosure · Investment programme 2026–2030

Stage is as reported in the October 2025 announcement, not a live construction status. Google says gigawatt-scale; this snapshot does not turn that wording into an exact MW total.

Google: Our First AI Hub in India, Powered by a $15 Billion Investment · 14 Oct 2025 · Older disclosure — check the original source

AdaniConneX Taloja campus

CoreWeave · Navi Mumbai, Maharashtra · Planned as reported

240 MW · First phase expected mid-2028

Optional additional capacity (not included in base): 240 MW

Not operational capacity. An option for up to another 240 MW is shown separately and is not added to the base 240 MW. The investor release is dated 7 October; a corporate page dateline says 6 October.

CoreWeave Investor Relations: CoreWeave Enters India, Expanding AI Cloud Platform With AdaniConneX · 7 Oct 2026

Definitions & limitations

Curated primary-source snapshot checked 8 October 2026; manually maintained, not live telemetry or a market-wide census. Stages are as reported at the linked disclosure date. Announced investment is not deployed capex; scope and horizons differ, so figures are not summed. City pins are approximate, not facility addresses. Missing MW or investment is not zero. Daily AI stories do not automatically update this dataset.